Email Colleague

WHO SHOULD ATTEND

CEO’s, Directors, Vice Presidents, Engineering Directors Responsible For:

  • Track Infrastructure High Speed Lines
  • Metropolitan & Regional Track Infrastructure
  • Maintenance Directors & VP’s
  • Engineering Strategy
  • Track Rehabilitation & Renewal
  • Track Inspection
  • Switches & Crossings
  • Track Geometry
  • Asset Management
  • Data Collection & Utilisation
  • Ai/Machine Learning
  • Track Digitisation Projects
  • (Advanced) Analytics
  • Data Science
  • Infrastructure & Platforms
  • IT
  • New Technology – Automated Inspection & Robotics

Plus:

  • Reliability Engineers
  • Design Engineers
  • Asset Managers
  • Platform Managers
  • Area Managers
  • Supply & Procurement Managers
  • EHS Managers
  • Systems Architects

Meet Leading Technology & Services Providers In:

  • Track Geometry 
  • Autonomous Inspection Systems
  • Autonomous Inspection Technologies
  • High-Res Camera Systems
  • Track Sensors
  • Remote Condition Monitoring
  • Track Vibration Analysis
  • Track Safety 
  • Switches & Crossings
  • Track Bed & Ballast Condition
  • Welds, Sleepers and Components
  • Wayside Monitoring
  • Track Inspection Technologies
  • Track Diagnostics
  • Thermal Imaging Solutions
  • Ultrasonics
  • Aerial Surveillance/Drones
  • 5G Enabled Sensors
  • Smart IOT Sensors & Edge Devices
  • Track Inspection Robots
  • Grinding Trains
  • Artificial Intelligence
  • Lidar Technology
  • GPS Technology
  • AI Robotics for Track
  • AI for Track Geometry
  • Fiber Optics
  • Intelligent Track Monitoring

HISTORY

LBCG launched its Rail Innovation sector series in 2008, pioneering forums on Future Fuels Rail Traction and Financing High Speed Rail. Intelligent Track Infrastructure Safety Congress 2022 is our 7th congress on this particular aspect of the rail industry.

Our rail series are regularly attended by hundreds of delegates including:

Heathrow Express, Transport for London, Eurostar, Japan Railways East Group, Grand Central Railway, Trenitalia, Porterbrook, SNCB, Southeastern, VR Group, Irish Rail, SJ, SNCF, AB SKF, ALPHA for Constructing, Alstom, ATOC Ltd, Bombardier Transportation, CAF Rail UK Ltd, Camlin group - Henesis, Cyient Europe Ltd, Danobat, DSB, Danish State Railways, Eduro AB, EKE-Electronics Ltd., ESG, Eversholt Rail Group, FAIVELEY TRANSPORT, GE Digital, Göteborgs Spårvägar AB, Grand Central, GVB, GVB Amsterdam, HaslerRail AG, Heathrow Express, Hitachi EU, Hitachi Rail, HS2 (High Speed Two Ltd), Irish Rail, Japan Railways East Group, KLD Labs, Inc., Knorr-Bremse GmbH, Division IFE Automatic Doors Systems, London Underground, LUCCHINI RS SpA, Lucchini Unipart Rail, Marubeni Corporation, Medha Servo Drives Pvt. Ltd, Molinari Rail Ltd., NEM Solutions, Network Rail High Speed Ltd, Nomad Digital-NomadTech, Norgren, Northern Rail, Perpetuum, Predikto, RFI, RATP, Ricardo Rail, Siemens AG, SJ, SNCB, SNCF, South West Trains, Stockholm County Council Transport Administration, Systecon (UK) Ltd, TAKARGO S.A., Trackside Intelligence Pty Ltd, Trenitalia, Unipart Rail, VR Group, Westermo Data Communications Ltd, Infrabel, Deutsche Bahn, MTR Hong Kong, LA Metro, SBB, Central Japan Railway, NS, Saudi Railway Company, Mass Transit Railway, Chiltern Railways, Southeastern, Govia Thameslink and many, many more.

Here's what past attendees have said about our conferences:

Bonatrans Group

"Very good conference. A unique opportunity to meet with head engineers and maintenance managers from variety of companies and projects and to really see the main trends on rolling stock maintenance"

Lloyd's Register Rail

"There was a wealth of experience and knowledge shared from key staff within the industry"

Eurostar

"An excellent opportunity to see different approaches in maintenance optimisation, to discover the latest technologies in the market and to expand your industry network across Europe."

AGENDA AT A GLANCE

DAY 1

GLOBAL RAIL OPERATOR PERSPECTIVE ON FURTHER IMPROVING TRACK INFRASTRUCTURE SAFETY AT REDUCED COST AND MORE PRECISELY PREDICT FAILURE & FORECAST WHEN TO INTERVENE 

  • Implementing New Technology To Further Improve Track Infrastructure Safety, Within A Cost Conscious Environment
  • What Decisions Should Infrastructure Operators Make Today That Could Impact Safety Over The Next 5 – 20 Years?What Is Affordable?
  • Cost Effective Measurement Of Switches & Crossings - Evaluate Next Generation Monitoring Technologies, A.I. Algorithms & Models 
  • Investing In New Technology & Intelligent Data Driven Approaches To Improve Monitoring Of Track Geometry For Defects  
  • Deep Dive Into Harnessing The Power Of A.I. For More Reliable Measurement And Diagnosis
  • Improving Data Interpretation & Visualisation For Predicting When To Intervene
  • Optimizing Workforce Skills & Competency To Make Sense Of Collected Data To Make More Accurate Predictions & Forecasts

Day 2:

TECHNOLOGY TO IMPROVE MONITORING AND DIAGNOSIS OF SAFETY CRITICAL ASSET TYPES  DURING SPECIFIC OPERATIONAL SITUATIONS 

>>Extreme Temperatures>>Rail Adhesion>>Earthworks>>Ballast Condition>>Obstacles>>Landslides>>RailContactFatigue

  • Technology Led Strategies For Measuring & Monitoring Individual Track Infrastructure Assets To Protect Against Weather & Climate Change Related Hazards 
  • Strategies & Technologies To Be More Innovative And Improving Safety More Cost Effectively 
  •  Optimal Monitoring Solutions For Identifying Defects Including Broken Rails & Tracks
  • Implement The Optimal Balance Between Manual Inspection With Automated Inspection 
  • UpgradingTrack Worker Competency & Training To Improve Situational Awareness & Decision Making Whilst Working On The Infrastructure, Out In The Field   
  • Introducing New Technologies Including Upgrading Signalling Train Warning Systems To Keep Track Workers Safe
Close

We use cookies to provide the best possible browsing experience.

If you continue without changing your settings we'll assume you're happy to receive our cookies.

However, if you would like to you can change this at any time by changing your browser settings, find out more by clicking here.

Okay. I got it.